5 pre-installation, Purpose, Audience – GE Industrial Solutions CPS3200U User Manual

Page 15: Precautions, Safety, Installation tools, System identification, Cps3200u installation purpose

Advertising
background image

CPS3200U Upstream System – 23” Product Manual

CPS3200U

CC848779826 r09 December 2013

15

5 Pre-Installation

CPS3200U Installation
Purpose

CPS3200U Shelf Installation guide for generic installations. Additional requirements are needed for application specific

installations. Refer to Appendix A for spacing requirements.

Audience

Field application personnel

Precautions

Read Safety section prior to installation.
Observe ESD protection while installing circuit packs

Safety

• Always consider personal safety.
• Make sure the system is properly grounded per the National Electrical Code, local building codes, and any specific

company requirements per standard practice.

• Remove all metal jewelry before beginning the installation.

Installation Tools

•A Complete Standard Insulated tool set

•Wire cutters and strippers

•Digital meter, +/- 0.02%

•Heat shrink gun

•Screw Drivers (flat-blade and Phillips)

•Torque wrench (0-240 in-lb / 28 Nm)

•ESD wrist strap

•Sockets

System Identification

Identify the product you have received. Make sure to select procedural steps to match the product you have.

Advertising