CPS3200U Upstream System – 23” Product Manual

CPS3200U

CC848779826 r09 December 2013

16

6 Installing the Shelf Level Upstream Product

Unpacking Shelf Level Upstream Product

Make sure the framework has the space and the airflow to provide an acceptable operating environment for the

CPS3200U shelf. Then unpack the equipment.

Step

Action

1.

Before opening the packaging, carefully inspect the outside in the presence of shipping

personnel for signs of damage.

2.

Carefully open the packaging to verify that the contents are complete and undamaged.

3.

If damaged, follow the shipping carrier’s procedure for filing a damage claim.

4.

Save the shipping package until all parts are operating within specifications. If the equipment

must be returned, it should be repacked in the original shipping crate.

Figure 3 QS912A Converter Shelf

(Shown configured with 2 operational circuits and 14 slot fillers for airflow control)

Installing and Powering the CP3200U Converter Shelf

Position the Shelf and mechanically attach it to the frame

Step

Action

1.

Locate the 2 mounting brackets, one on each side of the CPS3200U shelf; align the holes in the shelf-

mounting bracket with the holes in the mounting frame. Attach the brackets to the frame using two

screws per frame as shown.

Figure 4 Mounting the Converter Shelf