8 final installation, Installing the converters, Figure 25 shelf level esd jack – GE Industrial Solutions CPS3200U User Manual

Page 29: Figure 26 installing converters

Advertising
background image

CPS3200U Upstream System – 23” Product Manual

CPS3200U

CC848779826 r09 December 2013

29

8 Final Installation

Installing the Converters

QS982A Converters mount in the CPS3200U shelf. Note that Converter Card numbering starts from the left and should

be correlated to the marking on the panel located on the other end of the load cable that plugs into J1 and J2. This may

be a cross connect panel or the 5-pin protector block near the building entrance.

Step

Action

1.

Warning: You must properly protect yourself against ESD discharge prior to installing the

QS982A Controller.

2.

Use the ESD jack on the left of each converter shelf to provide grounding before removing

the QS982A converters from their anti-static wrap:

Figure 25 Shelf Level ESD Jack

3.

Remove the QS982A converter from its shipping container.

4.

Align the plastic converter housing on the right and insulated circuit board on the left.

5.

Guide the converter into the first available slot by positioning the plastic converter

housing in the notch on the top right edge of the opening.

Figure 26 Installing Converters

6.

Slide the converter into the shelf until it is fully seated in the connector on the rear of the

CPS3200U shelf.

7.

Push the display faceplate into the shelf until the latch on the top of the converter

housing catches.

8.

Repeat this process as needed for your application.

9.

Insert empty slot fillers into all unused slots to control airflow in multi-shelf systems

ESD Jack

Advertising