8 final installation, Installing the converters, Figure 25 shelf level esd jack – GE Industrial Solutions CPS3200U User Manual
Page 29: Figure 26 installing converters
CPS3200U Upstream System – 23” Product Manual
CPS3200U
CC848779826 r09 December 2013
29
8 Final Installation
Installing the Converters
QS982A Converters mount in the CPS3200U shelf. Note that Converter Card numbering starts from the left and should
be correlated to the marking on the panel located on the other end of the load cable that plugs into J1 and J2. This may
be a cross connect panel or the 5-pin protector block near the building entrance.
Step
Action
1.
Warning: You must properly protect yourself against ESD discharge prior to installing the
QS982A Controller.
2.
Use the ESD jack on the left of each converter shelf to provide grounding before removing
the QS982A converters from their anti-static wrap:
Figure 25 Shelf Level ESD Jack
3.
Remove the QS982A converter from its shipping container.
4.
Align the plastic converter housing on the right and insulated circuit board on the left.
5.
Guide the converter into the first available slot by positioning the plastic converter
housing in the notch on the top right edge of the opening.
Figure 26 Installing Converters
6.
Slide the converter into the shelf until it is fully seated in the connector on the rear of the
CPS3200U shelf.
7.
Push the display faceplate into the shelf until the latch on the top of the converter
housing catches.
8.
Repeat this process as needed for your application.
9.
Insert empty slot fillers into all unused slots to control airflow in multi-shelf systems
ESD Jack