2 metering, Metering – GE Industrial Solutions LP 33U Series 10 & 20 kVA Operating Manual User Manual

Page 24

Advertising
background image

Modifications reserved

Page 24/63

OPM_LPS_3UO_10K_20K_1US_V010.doc

Operating Manual LP 33U Series 10 & 20 kVA / S1

6.2 METERING

The METERING mode is entered any time the “METER” key is pressed.
The LCD screen will indicate a series of screenshots showing the measures of all electric parameters like
AC, DC and various statistics.

In this mode the keys perform the following functions:

Return to HOME screen.

Scrolls backward to the previous screen.

Scrolls forward to the next screen.

It is possible to view any key functional description by pushing the key for more than 3 seconds.


`

Home\Meter

BATTERY

Vp 164

V

Vn 164

V

T +25°

C

Charge level

80 %

Autonomy 9

Min

Charger mode

Off

Battery data screen

Vp

Voltage of positive (+) battery string.

Vn

Voltage of negative (-) battery string.

T

The temperature of the battery (“SENSOR DISABLE”
indicates sensor disabled).

Charge level

The battery charge level.

Autonomy

The estimated backup time with the
present load.

Charger mode The functionality of SBM (Superior Battery Management) can help to reduce the battery

recharging time, and improve the lifetime of the battery.
Beside the indication of the battery voltage on the display, a letter shows, according to the

table below, the operational status of SBM:

Abbreviation

Status of charger

Charger voltage

Description

Off

OFF

0 Vdc

Battery open circuit voltage

Top

ON

Boost (176 Vdc)

Boost charge with new Battery

Float

ON

Floating (164 Vdc)

Battery charged

Low

ON

Floating (164 Vdc)

Normal charge

Boost

ON

Boost (176 Vdc)

Boost charge

Equalize

ON

Boost (179 Vdc)

Battery equalization

Access to the Parameters for setting the SBM mode is password protected.
Please call your Service Center.


`

Home\Meter

BOOSTER

f :

60.0

Hz

L1 :

120

V

L2 :

120

V

L3 :

120

V

Vp :

215

V

Vn :

215

V

Booster data screen

f

The input frequency of the rectifier.

L1

L2

Input line voltage L1, L2 and L3 phases.

L3

Vp

Voltage of positive (+) booster string.

Vn

Voltage of negative (-) booster string.

Advertising