7.2.5 Reconnect a UPS unit to a Parallel System

WARNING !

Before connecting hazardous voltages, make sure that:
The connection to the electrical system has been performed by qualified personnel;
The equipment frame has been correctly grounded to the main earth;
Make sure that utility input protection is removed;
All the panels removed to allow the UPS connection have been correctly reinstalled;
The UPS switches Q1 and Q2 are open (Pos. 0);
The “rectifier input fuses - F1, F2, F3” and “battery fuses - F9, F10, F11/ F13, F14, F15”

is removed.


This procedure must be performed when the load is supplied by the other units of the UPS Parallel
System
and an additional unit must be switched ON and connected to the parallel bus in order to share
the load with each other.

This unit must be completely switched OFF and not powered.

1. Insert the “rectifier input fuses - F1, F2, F3” on this UPS unit.

2. Switch-ON the utility voltage from the input distribution (both rectifier and bypass if separated)

on this UPS unit.

Overall test results

Test1 OK

Test7 OK

Test2 OK

Test8 OK

Test3 OK

Test9 OK

Test4 OK

Test10 OK

Test5 OK

Test11 OK

Test6 OK

The UPS performs a SELFTEST.

A successful termination of the tests will be indicated with Overall
test results “OK”.
Commissioning cannot be continued should one or more tests result
to be negative.
Please contact in this case your Service Center.

3. Insert the “battery fuses - F9, F10, F11 / F13, F14, F15” (insert the external battery fuses in case

of external battery) on this UPS unit.

4. Close output switch Q1 (Pos. I) on this UPS unit.

`

Home\Meter

BOOSTER

f :

60.0

Hz

L1 :

120

V

L2 :

120

V

L3 :

120

V

Vp :

215

V

Vn :

215

V

Verify on this UPS unit, selecting the screen METERING/BOOSTER/Vp

and Vn, that the booster voltage has reached about 215 Vdc.

5. Insert the inverter by pressing Inverter ON ( I ) key on this UPS unit.

When the inverter will be synchronized, the unit will be
automatically connected with the parallel bus bar and the load will
be shared with the other units.
LED Alarm turn Off and the LED Operation must be lit.
The synoptic diagram, on all UPS units, must display the status
LOAD SUPPLIED BY INVERTER
.

END OF PROCEDURE