Fluid Components International Quality Assurance Manual User Manual

Page 33

Advertising
background image

DOCUMENT NUMBER

07QA070003

SUBJECT

Quality Manual

CAGE CODE

64818

Date

10-8-2012

SECTION

1

PAGE

11

CURRENT
REVISION

L

7.3

DESIGN AND/OR DEVELOPMENT

7.3.1 DESIGN AND/OR DEVELOPMENT PLANNING

FCI plans and controls design and/or development of the product.

Design and/or development planning determines:

a)

Stages of design and/or development,

b)

Review, verification and validation activities appropriate to each design
and/or development stage, and

c)

Responsibilities and authorities for design and/or development.

Interfaces between different groups involved in design and/or development are
managed to ensure effective communication and clear assignment of
responsibility.

Planning output is updated, as appropriate, as the design and/or development
progresses.

7.3.2 DESIGN AND/OR DEVELOPMENT INPUTS

Inputs relating to product requirements are determined and records maintained.
These include:

a)

Functional and performance requirements,

b)

Applicable regulatory and legal requirements,

c)

Applicable information derived from previous similar designs, and

d)

Any other requirements essential for design and/or development.

These inputs are reviewed for adequacy. Incomplete, ambiguous, or conflicting
requirements are resolved.

7.3.3 DESIGN AND/OR DEVELOPMENT OUTPUTS

The outputs of the design and/or development shall be in a form that is suitable
for verification against the design and/or development inputs and shall be
approved prior to release.

Design and/or development output:

a)

Meets the design and/or development input requirements,

b)

Provides appropriate information for purchasing, production, and service
provisions,

c)

Contains or references product acceptance criteria,

Advertising