8.2

Installation and Start-Up Sequence

To start the UPS:

1.

Attach the load device, if desired, but do not turn it on until you have set the
UPS output voltage, as described below.

2.

Turn on the circuit breakers for the AC input, the Bypass input, and the
Battery. The UPS performs a self test; this takes about a minute. Afterwards,
you should see the following screen.

Set the output voltage

Before turning the UPS on, you must set the UPS output voltage, if needed.
See “Modifying the output AC voltage” on page 50.

Set the system clock

Now set the system clock to the correct date and time.
See “Setting the system clock” on page 48.

Modify the screen contrast (optional)

You can modify the screen contrast, if necessary.
See “Setting screen contrast” on page 49.

Set Automatic Restart mode (optional)

You can enable automatic restart mode at this time, if desired.
See “Automatic Restart” on page 56.

POWER+ SA User Guide (UL), Release 1.0

46