1 installation considerations, 2 equipment location, 3 site connection diagram – MaxPower Corp Gamatronic Power+ SA User Manual

Page 71

Advertising
background image

Gamatronic Electronic Industries Ltd.

15.2.1 Installation Considerations

1.

Use the shortest possible output distribution cable runs at the installation site,
consistent with logical equipment arrangements and in compliance with NEC
and local electrical codes. Allow space for additional future equipment.

2.

The recommended ambient temperature for operation is 20-30°C (68-86°F).
Humidity must be less than 95% non-condensing. In altitudes above 2000
meters (6560 feet), the UPS rating will be reduced.

3.

The route and foundation to the installation site must be capable of supporting
the weight of cabinets and moving equipment. Plan the route to ensure that the
unit will pass through all elevators, corners, and doorways to prevent damage.
Refer to P

OWER

+

SA Specifications on page 88 for specific information

regarding the cabinet size and weight.

4.

Place electrical equipment (load, computer monitor, etc.) at least one meter
away from the UPS.

15.2.2

Equipment Location

1.

As with all electrical equipment, installation and serviceability will be easier if
access is provided on all sides of the equipment.

2.

Verify adequate clearance around cabinet to allow unrestricted exhaust air to
flow (12 inches minimum).

3.

Verify that the UPS system is installed in a clean, cool, and dry location.

15.2.3 Site Connection Diagram

Figure 15-1: Site connection block diagram

POWER+ SA User Guide (UL), Release 1.0

65

Advertising