Power supply connection, Mps-24af main power supply, Mps-24bf main power supply – Fire-Lite LDM-32F Lamp Drivers User Manual

Page 34: Eia-485 connection, Figure 21 mps-24af power supply connections, Figure 22 mps-24bf power supply connections

Advertising
background image

Appendix A: Sensiscan 2000

Power Supply Connection

34

LDM-32F PN 50055:C 03/20/01

Power Supply Connection

The LDMs may be powered by an MPS-24AF or an MPS-24BF. The power
run to the LDMs need not contain a Power Supervision Relay since loss of
power is inherently supervised.

MPS-24AF Main Power Supply

Connect the power run for the LDMs to MPS-24AF TB3, Terminals 1 (+)
and 2 (–). Maximum current is 1 amp.

Figure 21 MPS-24AF Power Supply Connections

MPS-24BF Main Power Supply

Connect the power run for the LDMs to MPS-24BF TB2, Terminals 1 (+)
and 2 (–). No more than 200 mA current can be drawn from these terminals
in standby or alarm.

Figure 22 MPS-24BF Power Supply Connections

EIA-485 Connection

The EIA-485 bus that communicates with the LDM must be connected to the
CPU as illustrated below.

Note: The CPU must be Revision D or greater. (The revision level of the CPU is marked
on a label affixed to the upper board.)

Figure 23 EIA-485 Connection to CPU

P4

P3

TB2

P5

R27

P2

+24 R COMM ON +24 COMMON

POWER LIMITED

BAT + BAT -

To LDM-32F TB1
Common In (–)

To LDM-32F TB1

Power In (+)

LD

M

32F

-mp

s24af.cd

r

P3

TB3

TB2

6 7 8

CO MMON

CO MMON

BATT -

+24 VRESET

+24 VPOW ER

BATT +

1 2 3 4

1 2

LD

M

32F-

m

ps2

4bf.cd

r

To LDM-32F TB1
Common In (–)

To LDM-32F TB1

Power In (+)

EIA-485

To TB2 In (–)

EIA-485
To TB2 In (+)

Sensiscan 2000 CPU

LD

M

32F

-s200

0.cdr

Advertising