2 shipping information, 1 unpacking and inspection, 2 in the event of shipping damages – Sterlco S Series Central Chilling Stations User Manual

Page 15

Advertising
background image

SSC Series Central Chilling Stations

Page 15 of 86

2 Shipping

Information

2-1 Unpacking and Inspection

You should inspect your central chilling station for possible
shipping damage. If the container and packing materials are in re-
usable condition, save them for reshipment if necessary.

Thoroughly check the equipment for any damage that might have
occurred in transit, such as broken or loose wiring and
components, loose hardware and mounting screws, etc. In case of
breakage, damage, shortage, or incorrect shipment, refer to the
following sections.


2-2 In the Event of Shipping Damages

Important!

According to the contract terms and conditions of the Carrier,

the responsibility of the Shipper ends at the time and place of shipment.

; Notify the transportation company’s local agent if you discover

damage.

; Hold the damaged goods and packing material for the

examining agent’s inspection. Do not return any goods to
Sterling before the transportation company inspection and
authorization
.

; File a claim against the transportation company. Substantiate

the claim by referring to the agent’s report. A certified copy of
our invoice is available upon request. The original Bill of
Lading is attached to our original invoice. If the shipment was
prepaid, contact Sterling at (414) 354-0970 for a receipted
transportation bill.

; Advise Sterling regarding your request for replacement

and to obtain an RMA (return material authorization)
number.

Advertising