SSC Series Central Chilling Stations

To Process

The chilled water supply outlet leading to the process being
controlled.


From Process

The chilled water return for water returning back to the chiller
from the process to be cooled and recirculated.

3-5 Making Tank Piping Connections

If you have purchased the SSC Series central chilling station with
the integral pump tank, please proceed with this section.


Return

Bring the chilled water returning from the process to the pump
tank warm

From Process

side. This line is sized according to the

flow rate from the process to the pump tank. See Section 3-3 on
Page 21 for more information on piping considerations.

Important!

Do not use the SSC Series unit to support piping.

Makeup

Connect a city water source to maintain water level in the pump
tank.


Overflow

Connect the

OVERFLOW

outlet to an approved, trapped drain to

permit excess water in the pump tank to overflow to the drain. The
overflow line is sized according to the size of the pump tank.


To Drain

Connect to a 1½” line (approx. 63 mm) leading to an approved,
trapped drain. You can drain the pump tank if necessary.