Installation

Pre-Installation Inspection

Upon delivery, visually inspect the crate, carton and

parts for any visible shipping damage. If the crate,

carton, or cover is damaged or signs of possible

damage are evident, have the carrier note the condition

on the shipping papers before the shipping receipt is

signed, or advise the carrier of the condition as soon as

it is discovered.
Remove the crate and protective cover as soon as

possible and check the items listed on the packing list.

Advise the carrier of any damaged or missing articles

as soon as possible. A written claim should be filed

with the carrier immediately if articles are damaged or

missing.

IMPORTANT: Remove the shipping tape from the

two back draft dampers located in the exhaust

outlet.

IMPORTANT: Warranty is void unless tumbler is

installed according to instructions in this manual.

Installation should comply with minimum

specifications and requirements detailed in this

manual and applicable local gas fitting regulations,

municipal building codes, water supply regulations,

electrical wiring regulations, and any other

relevant statutory regulations. Due to varied

requirements, applicable local codes should be

thoroughly understood and all pre-installation

work arranged for accordingly.

IMPORTANT: Keep tumbler area clear and free

from combustible materials, gasoline and other

flammable vapors and liquids.

NOTE: 3 Phase Only – Each tumbler must be

connected to its own individual branch circuit

breaker, not fuses, to avoid the possibility of “single

phasing” and causing premature failure of the

motor(s).

Materials Required (Obtain Locally)

All Models

One Single Pole fused disconnect
switch or circuit breaker on 1 Phase
models.
Circuit breaker on 3 Phase models.

Gas Models

One gas shut-off valve for gas service
line to each tumbler.

Steam Models

One steam shut-off valve for steam
service line to be connected upstream of
solenoid steam valve.
Two steam shut-off valves for each
condensate return line.
Flexible steam hoses with a 125 psig
(pounds per square inch gauge)
(8.79 kg/sq. cm) working pressure for
connecting steam coils. Refer to Figure
23

for sizing and connection

configurations.
Two steam traps for steam coil outlets
to condensate return line.
Optional – Two vacuum breakers for
condensate return lines.