Steam Requirements

49

M414905

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

Piping Recommendations

Trap each steam coil individually. Always keep

the trap clean and in good working condition.

When tumbler is on the end of a line of

equipment, extend header at least 4 feet (1.2 m)

beyond tumbler. Install shut-off valve, union,

check valve and bypass trap at end of line. If

gravity return to boiler, omit trap.

Insulate steam supply and return lines for safety

of operator and safety while servicing tumbler.

Keep tumbler in good working condition. Repair

or replace any worn or defective parts.

Installing Steam Trap and Making
Condensate Return Connections

The steam trap must be installed and the coil outlet

connections must be connected to the condensate

return lines. The following steps outline the procedure

for installing the steam trap and connecting the

condensate return lines. Refer to Figure 23 for typical

installations.

1. Use flexible lines between steam inlet solenoid

and steam coils, as well as outlet between steam

coil and traps.

2. If necessary, install a strainer at the end of each

flexible hose.

3. Install a steam trap to each strainer.

IMPORTANT: Steam trap must be installed a

minimum of 18 inches (457 mm) below the steam

coil outlet connections.

4. Install a shut-off valve to each steam trap.
5. Connect to the condensate return lines.
6. For steam solenoid valve wiring connections,

refer to Wiring Diagram supplied with tumbler.

Thermal Oil Prep

It is the responsibility of the customer to install

appropriate coil and heating system for thermal oil

prep models. Alliance Laundry Systems, LLC. is not

responsible for the performance or safety of the

customer installed thermal oil system. To ensure

proper operation, refer to the Specifications and

Dimensions section for the BTU input of equivalent

steam models. Thermal oil systems that do not deliver

appropriate BTUs will dry slower. For solenoid valve

wiring connections, refer to the Wiring Diagram

supplied with tumbler.

WARNING

All system components must have a

125 psig (8.6 bar) working pressure.

Shut-off valves must be installed upstream

of the steam solenoid valve and

downstream of each steam trap so

components can be isolated for

maintenance or emergency purposes.
All components (solenoid valve, traps)

must be supported to minimize loads on

the tumbler steam coil connections.

W480R2

WARNING

The flexible steam hoses connecting the

coil outlet connections and steam traps

must have a minimum of 125 psig

(pounds per square inch gauge) (8.79 kg/

sq. cm.) working pressure. A shut-off

valve must be installed downstream from

each steam trap so the condensate return

line can be isolated in event a steam trap

requires maintenance.
Each steam trap must be supported so

minimum load is exerted on the coil outlet

connection.

W066

Advertising