Jumper configuration instructions, Ferrite ring installation – Alliance Laundry Systems TMB795C User Manual

Page 46

Advertising
background image

Electrical Requirements

M414905

44

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

Jumper Configuration Instructions

Changing the transformer configuration jumper is

required, PRIOR TO SUPPLYING POWER TO

THE MACHINE, if any of the following apply:

IMPORTANT: Failure to install the proper

configuration jumper may result in damage to

sensitive electronic controls and may void

warranty.

You have 200 – 208 Volt service and are

connecting a model rated for 240 Volt operation.

Replace the 240 Volt jumper with the 208 Volt

jumper per the conversion label, located on the

rear of the tumbler, sign and date conversion

label to document the conversion.

You have 400 – 415 Volt service and are

connecting a model rated for 380 Volt operation.

NOTE: CE electro-mechanical timer models (MT,

RT and CD control suffixes) do NOT require

conversion jumper.

Replace the 380 Volt jumper with the 415 Volt jumper

per the conversion label, located on the rear of the

tumbler, sign and date conversion label to document

the conversion.

Ferrite Ring Installation

Gas and Steam OPL Control Models Only
The ferrite ring provided in the literature packet must

be installed over the power leads during connection of

electrical service. The ferrite protects the sensitive

electronic controls from destructive electrical

disturbances which may be present on power lines to

the machine. Failure to properly install the ferrite ring

may result in damage to the electronic controls and

will void control warranty.
To install:

1. Immediately after connection of power leads and

before applying power to machine, locate each of

the incoming service leads including ground.

2. Snap the ferrite ring closed over all the service

leads inside of the contactor box as shown. It is

important that the ferrite ring be installed inside

the contactor box. Refer to Figure 22. Do not

install the ferrite outside of the box or other area.

Make sure that service leads are in the center of

the ferrite before closing the ring so as not to

pinch or damage leads.

Figure 22

T225S

1

Ferrite Ring

2

Contactor Box

3

Jumper

1

2

3

Advertising