Chatsworth Products Hot Aisle Containment User Manual

Page 10

Advertising
background image

BTS Aisle Containment Manual, Rev. 1.0

___

December 2013

Chatsworth Products

10

ASSEMBLING THE BUILD TO SPEC KIT - The following sections cover recommended
assembly and installation methods. Use alternate methods or order of assembly as required.

Step 1: Join Extrusions to form the bottom, sides of the

duct and support from ceiling or top of cabinets.

Step 2: Level the sides and connect the ends to

form the bottom of the duct.

Step 3: Cut and install vertical supports at

each corner.

Step 4: Cut and install cross braces and intermediate

vertical supports.

Step 5: Cut and install the frame and cross braces at the

top of the duct.

Step 6: Cut, fit and install the panels. You may also

need to add drop panels and end fascias.

Advertising