Chatsworth Products Hot Aisle Containment User Manual

Page 17

Advertising
background image

BTS Aisle Containment Manual, Rev. 1.0

___

December 2013

Chatsworth Products

17

7. Add vertical extrusions every 48” (1200 mm) or at a smaller even interval across the

length of the duct. Use two gussets with two screws each to secure each vertical
extrusion as shown below. The flat side of the extrusion faces the inside of the duct.

This view is from the
outside of the
containment/duct.

The flat side of the
extrusions face the
inside of the
duct/containiment.

Advertising