BTS Aisle Containment Manual, Rev. 1.0

___

December 2013

Chatsworth Products

32

INSTALLATION

The Aisle Containment Door is bolted to the floor and supported to the top of TeraFrame or
GlobalFrame cabinets.

FLOOR PREPARATION

SLAB FLOOR

Install four concrete anchors, two for each side panel, using the floor drilling template to
accurately locate the holes. The template is not included with the door; it must be ordered
separately, 32875-701 for the double door or 32875-702 for the single door.

DOUBLE DOOR

For the double door, position the template (PN 32875-701) with the flanges down and the
holes close to the cabinet. The side flange should butt against the cabinet side and the
template should be centered on the aisle; the slots at the center of the template can be
used as a guide. Drill four holes, two at each end, through the template; the template holes
are 1/2” diameter which should be the correct size for 3/8” concrete anchors (not included).
If possible use the outside set of holes as shown in the picture below; the other holes can
be used if there is an obstruction in the concrete.