THRUST POT LUBRICATION AND MAINTENANCE
OIL LUBRICATED THRUST POT

(SEE FIGURE 19)

Pumps are shipped without oil. Oil-

lubricated the bearings must be lubricated

at jobsite.

It is a good practice to flush the oil reservoir before first

time operation and at the time of oil changes to remove

all grit particles in the oil reservoir sump. Use the same

type of oil to flush reservoir as specified for lubrication.

(See page 38 on recommended turbine oil.) Remove

drain plug (Item # 39) before flushing. Flushing oil

may be poured through oil fill opening (item #33) after

removing oil fill plug #39. The proper oil level when

the unit is not running shall be not more than 1/8” to

1/4” from the top of the oil sight gauge (Item #37).

Overfilling may result in overheating of the unit. During

operation the oil level in the sight gauge may be higher

than the recommended range mentioned above. Under

no circumstance is it allowed to rotate the unit when the

oil in the sight gauge is not at the required level.

To avoid oxidation of the anti-friction bearings during

shut-down periods lasting longer than one week, it is

recommended to fill up the oil reservoir until the oil runs

over the oil retainer tube (Item #2) and down the shaft

so that the bearings remain completely immersed in the

oil. Before start -up, do not forget to drain the excess oil

to its required level. Oil change depends on the severity

of the environment. Generally speaking, when the oil

in the sight gauge changes to a darkish brown color it

is time for an oil change. However, for a longer bearing

life, it is recommended that the oil be changes every six

months. Be sure to flush the oil reservoir (see above) with

each oil change.

GREASE LUBRICATED THRUST POT

(SEE FIGURE 18)

Lubricating Intervals in Operating Hours

Thrust

Operating Speed (RPM)

Rating <1770 1770 2900 3500

2000

lbs 2000 2000 2000 1800

4000

lbs 2000 2000 1600 1400

6600

lbs 2000 2000 1400 1200

The bearing is pre-lubricated at factory. Re-grease the

bearing according the following procedure and per the

schedule in the above table. Following are the re-grease

procedure:

1. Wipe dirt from grease fittings.

2. Check relief port 180º from fitting to make sure it is

open.

3. Fill the grease cavity through the fitting until fresh

grease comes out the relief hole.

4. Ensure the relief port closes.

NOTE: The bearing temperature usually rises after

re-greasing due to an excess supply of grease.

Temperature will return to normal after the

pump has run and purged the excess from the

bearings, usually two to four hours.

For most operating conditions, lithium based NLGI 2

grease is recommended. This is the grease factory used

for pre-lubrication. This grease is acceptable for bearing

temperatures of 5º to 230º F. Temperature extremes

(either high or low) may require different type grease.

Following table lists some various manufacturers’

compatible grease:

Mobil

Mobilith AW2

Amoco

Amolith EP2

Ashland

Multilube EP2

Exxon

Unirex N2

Shell

Alvania EP LF2

Unocal

Unoba EP2

Chevron

Dura-Lith EP NLGI2

NOTE: If it is necessary to change the grease type or

consistency, the bearing must be removed and all

the old grease eliminated from the housing and

bearing.

Bearings must be lubricated properly in

order to prevent excess heat generation,

spark and premature failure.