page 50 — MaYCO LS600p CONCReTe pUMp • OpeRaTiON MaNUaL — Rev. #0 (05/13/13)

7. Remove the three 3/8 – 16 x 3” bolts from the piston.

Remove the front faceplate.

8. Install two the 3/8’ 16x3” bolts back into the piston – do

not tighten. Use the two bolts as leverage to remove

the rubber piston cup and rear components.

9. Obtain two 3/8 16x7” full thread studs (these studs will

be used to assist in assembly alignment) insert the

two studs into the piston adapter. Coat the concrete

cylinder with grease.

10. Install the “O” Ring around the oiler plate. Install the

plate into the concrete cylinder utilizing the studs for

alignment.

11. Install the felt holder over the oiler plate. Install felt ring

into felt holder. Install the bronze ring.

12. Using silicon sealant place a small bead of sealant

material on the front of the rubber piston cup and the

rear of the face plate. Install over alignment studs and

into concrete cylinders.

13. Insert one 3/8” 16x3” bolt into the open bolt hole,

remove the alignment studs one at a time and install

the remaining 3/8” 16x3” bolts.

Wear Plate And Cutting Ring Replacement

Due to the swinging motion of the

nun-plate and the

abrasive nature of concrete, it is normal for the cutting

ring to wear on the side that shears through the concrete

inside the hopper.
If the wear ring and wear plate do not fully seat against each

other the concrete slurry will pump into the hopper. This

condition can be easily observed by the sudden change of

the level of concrete inside the hopper during each stroke.

NOTICE

Felt ring must be saturated with 30 wt. oil prior to

installation.

NOTICE

Before installing 3/8” bolts, coat the back of bolt heads

with silicon sealant. Torque all three bolts equal at 55 ft.

lbs. each.

1. Remove the two hydraulic hoses connected to the

remix motor. Plug the ports with fittings (not provided)

to prevent hydraulic hose leakage.

2. Remove the hopper discharge nipple and loosen sleeve

seal. Inspect and replace if wear is excessive.

3. Remove the two tie rod nuts and the four eyebolt nuts

securing the hopper to the pump frame.

4. Using an approved lifting device, remove the hopper

using extreme care not to damage the hopper seal.

5. Remove the four 1/2” 1-1/4” bolts that hold the shuttle

tube to the nun-plate and remove shuttle tube.

6. Using two small pry bars remove the rubber energizer

ring, steel insert ring and wear ring.

7. Clean out all concrete build up in and around the nun-

plate area with a wire brush.

8. Inspect the wear components for indications of wear.

The wear plate has two wear surfaces.

Wear plate installation

1. Install the two cylinder

o-rings.

2. Using silicon sealant, coat the circumference of the

concrete cylinders, the back of the wear plate and

around the five bolt holes. Next, install the wear plate

and the five bolts. The bolts must all be equally snugged

and tightened to 100 foot pounds each.

Wear Ring installation

1. Install the wear ring into the

nun plate.

2. Install the steel insert ring inside of the rubber energizer

ring.

3. Install the energizer ring assembly into the nun plate.
4. After installing the above mentioned components

the machine can be reassembled by reversing steps

1 through 5 of the Wear Plate and Cutting Ring

Replacement Procedure.

NOTICE

The energizer ring and wear ring will normally have

concrete contamination holding them in position. It will

be required to chip some of the concrete loose to better

expose the energizer ring.

MAIntEnAncE

Advertising