R-Series Data Center Products User’s Guide

Chassis and Blade Installation • 19

Chapter 3. Chassis and Blade

Installation

The following instructions are intended for use by IT technicians familiar with
computer systems at the hardware configuration level.

Tools for Installation

All functions and operations described in the following installation procedures can be
performed with the following tools:

#2 Phillips screwdriver

C/Port adjustment tool (included in Chassis Accessory Kit)

A 1/4-inch nut driver with a magnetic tip is suggested for removing and replacing the
self-tapping sheet metal screws used on the chassis.

Shipment Components

Upon receipt of your shipment, carefully examine the outside of all the boxes before
opening. If you find any external damage, do not open the boxes. Contact and
notify the shipper that damage has occurred and request an inspection by them before
proceeding.

The following components are shipped in separate cartons:

Chassis—This should be the first carton to be opened and used in the installation
process after the racks or cabinets have been installed.

R4300 modules—Packaged separately from the chassis, these modules are
installed by the user when the chassis is installed. Each module box contains the
interconnection cables necessary to interface it to another chassis.

PC blades – These are shipped four to a box. Do not open these boxes until your
chassis assemblies are installed and you are ready to install the PC blades.

User ports – C/Port or other client desktop units are shipped with or without
power supplies, depending on your configuration. Do not open these boxes until
your blades are installed and you are ready to begin desktop installations.