Chassis configuration and operation – ClearCube R-Series Data Center Products User Manual

Page 49

Advertising
background image

R-Series Data Center Products User’s Guide

Chassis and Blade Installation • 25

The standard 10-amp power cords are acceptable for use with the Fiber Transceiver.
See “Safety Guidelines” on page xiii for more information.

Chassis Configuration and Operation

The R4300 chassis provides a wide range of options for zero client and C/Port
connections to blades and to networks. Chassis modules can be installed when
installing chassis or when installing blades. Because these modules provide all the
data I/O for the system, cabling cannot be completed until these modules are in place.

The three externally accessible module bays are as follows:

Connect Bay

Management Bay

Network Bay

Each of these modules support hot-swap operation.

Make sure your power strips, power grid, and circuit breakers can
safely provide the required current. Ensure that any extension cords
used meet local safety regulations and fire codes. When specifying
uninterruptible power supplies (UPS) be sure to include the Fiber
Transceiver peak current draws in your calculations to ensure the
UPS has adequate capacity.

CAUTION: To avoid equipment damage and potential personal injury,
always install the chassis in a rack before installing any blades in it.

Advertising
This manual is related to the following products: