Metrohm 881 Compact IC pro – Cation User Manual

Page 47

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

881 Compact IC pro – Cation

■■■■■■■■

39

In order to bring the eluent to the required temperature, the capillaries
must be guided through the capillary recesses (21-2) before connection to
the separation column.

Note

The column input capillary is already installed in newly delivered instru-
ments. The following installation instructions need not be carried out at
the time of initial installation.

Installing capillaries in the column heater

1 Opening column heater

Loosen the knurled screw(s) at the door to the column chamber and
open the door.

Advertising