Routing the load cell cable, Routing the load cell cable -7 – Dynojet 224: Pit Eddy Current Brake User Manual

Page 33

Advertising
background image

TO R Q U E M O D U L E I N S T A L L A T I O N

Torque Module Installation

Version 2

Model 224 Pit Eddy Current Brake Installation and User Guide

2-7

R

OUTING

THE

L

OAD

C

ELL

C

ABLE

1

Route the load cell cable from the load cell, through the PVC conduit in the pit
(not used by input power cable), and over to the dyno electronics.
Make sure the load cell cable is clear of any power cables or hot or rotating
objects.

2

Route the load cell cable through the cable clamp on the back of the dyno
electronics enclosure.
2a

Loosen the two screws and lift the clamp up to slide the load cell cable
through.

2b

Secure the clamp with the two screws.

3

Attach the 9-pin connector on the load cell cable to the front of the Torque
Module and tighten down the screws.

4

Attach the power cord to the dyno electronics and turn the power switch on.

Figure 2-7: Route the Load Cell Cable to the Torque Module

torque module

cable clamp

load cell cable

Advertising