0 installation, 1 unpacking and assembly, 2 enclosure disassembly – Rice Lake 320IS Plus Intrinsically Safe Digital Weight Indicator - Installation Manual User Manual

Page 15: Installation, 1 unpacking and assembly 2.2 enclosure disassembly

Advertising
background image

320IS Plus Installation Manual - Installation

9

2.0

Installation

This section describes installation of load cells, power supply, fiber optics, and ferrite bead for the

320IS Plus

indicator.

Use a wrist strap to ground yourself and protect components from electrostatic discharge (ESD) when
working inside the indicator enclosure.

Component level repair, excluding board-swapping, is not permitted on Factory Mutual Approved
equipment by anyone other than the manufacturer. It is mandatory to return the

320IS Plus

to Rice

Lake Weighing Systems for repairs.

2.1

Unpacking and Assembly

Immediately after unpacking, visually inspect the

320IS Plus

to ensure all components are included and

undamaged. The shipping carton should contain the indicator with attached tilt stand, this manual, and a parts kit.

If any parts are missing or were damaged in shipment, notify Rice Lake Weighing Systems and the shipper

immediately. See Table 2-5 on page 18 for parts kit.

2.2

Enclosure Disassembly

The indicator enclosure must be opened to connect cables for load cells, communications, and power.

Before opening the unit, ensure the power is disconnected from the power outlet.

1. Ensure power to the indicator is disconnected.
2. Place the indicator face-down on an antistatic work mat.
3. Remove the screws that hold the backplate to the enclosure body.
4. Lift the backplate away from the enclosure and set it aside.

CAUTION

Important

WARNING

Advertising