Brick loaDinG

Load the brick, one row at a time, using a left side, right side, center pat-

tern. Start at the back of the brick core and work forward. Make sure the

brick are placed so the grooved side is facing up and the ridges are on the

left and right. (See Figure 5.)
BrICk INSTAllATION TIpS:

Install bricks carefully to avoid damage to the insulation panels.

Remove loose brick debris to prevent uneven stacking of brick, as

this can make installation of the elements and the brick core temperature sensor(s) difficult.

Brick rows MUST line up front to back and side to side.

Half brick makes brick loading easier by evening out the

stacks. Use HALF BRICK (white boxes) in the proper rows

and positions as indicated in Figure 5.

Alternate the direction of the brick’s indicator in every other

brick row. See Figures 3 and 4.

All bricks in odd numbered rows (1, 3, 5, 7, 9, and 11) must

have the indicator facing forward as shown in Figure 3.

The bricks in even numbered rows will have the indicator

facing back. See Figure 4.

initial Set-uP

Step 1 Remove the Information Package from the outside of the

shipping box and unpackage the Comfort Plus Hydronic

heating system.

Step 2 Move the heating system into its installation location.

The Comfort Plus Hydronic is capable of fitting through

a 30" doorway (minimum) without disassembling. If it is

necessary to disassemble the system, refer to the disas-

sembly instructions (Page A.12) in this manual.

Step 3 Once in place, adjust the leveling legs on the bottom of

the system as necessary to prevent rocking. If not placed

properly the system may bend or twist during the brick

loading process, making element and brick core tempera-

ture sensor installation difficult.

Step 4 Remove the painted front panel of the brick storage cabi-

net by removing the sheet metal screws along the top, bottom, and sides of the panel. Detach by pulling

the bottom of the panel forward and down.

Step 5 Locate the element wiring harnesses and brick core temperature sensor(s) behind the front panel and dis-

connect them from their shipping position. Carefully position them to avoid damage during brick loading.

Models 5130 and 5140 have two brick core temperature sensors.

Step 6 Remove the galvanized front panel and set it aside.

Step 7 Carefully lift the two insulation blankets, one at a time starting at the bottom, and drape them over the top

of the system.

Use face mask, gloves, and long sleeved garments when handling insulation materials in

compliance with generally accepted safety practices.

Step 8 Remove the front air channel by pulling out at the top.

Step 9 Remove the heating elements from inside the brick core cavity.

To ensure proper operation, read and

follow installation instructions carefully.

DO NOT install the Comfort Plus

Hydronic system on its shipping

pallet.

DO NOT extend the leveling legs

more than one inch.

DO use and follow generally ac-

cepted safety practices when

handling insulation material.

DO have equipment installed by a

qualified technician in compliance

with all applicable codes and regu-

lations.

IMPORTANT

Installation

3.03

Comfort Plus Hydronic

Comfort Plus Hydronic

Installation

3.04

Risk of fire. Can cause personal

injury or death. DO NOT operate

the system if damage to the insu-

lation panels on the inner sides

of the brick core occurs.

WARNING

FIgUrE 3

i.e.: Rows 1, 3, 5, 7, 9, and 11 in 5140

Front

Indicator