Iii. instrument installation, Iii.1 mounting the instrument, Iii.2 electrical connections – Brookfield R/S CPS Rheometer User Manual

Page 9

Advertising
background image

Brookfield Engineering Labs., Inc.

Page 9

Manual No. M08-218-B0212

III. Instrument Installation

In this section you will learn how to set up and use the R/S CPS+ Rheometer for the first mea-

surement, which include:

- Assembly of the R/S CPS+ Rheometer,

- Electric connections

- Installation of accessories such as thermostatting device, cooling device, and measuring

systems

- Hose connections

III.1

Mounting the Instrument

The R/S CPS+ Rheometer should be positioned on an even surface, such as a laboratory bench.

There should be enough room to easily handle the instrument. Beside the rheometer, place the

additional control unit PT-S (peltier temperature controller) to be installed for Models R/S CPS+

P1 and P2 and the controller for electrical heating EHR. Two cables connect the R/S CPS+ and

temperature controller. Exposure to direct sunlight and other heat sources is to be avoided in

order to ensure optimum temperature control.

III.2

Electrical Connections

Connections for the electrical components of the R/S-CPS+ Rheometer are located on the back

of the instrument.

PRINTER

RS232

POWER

DC

Pt 100

OUT / DC

RS232 / Peltier

Interface for Printer Connection

Connecting Socket for Pt100

Connecting Socket for AC Adapter

PC Interface for Peltier Temperature
Control (for Models P1 or P2 only)

Interface for Computer Connection

ON/OFF Switch

Connecting Socket Power Supply

Peltier Heating

(Models P or P2 only)

Figure II-3: Operating and connecting elements at the back side of the measuring head

All cables to and from the R/S-CPS+ Rheometer must be connected or

disconnected only when the instrument is switched off!

Advertising