3 scope of delivery / serial accessories – KERN & SOHN DLT 100-3N User Manual

Page 15

Advertising
background image

DLT_N-BA-e-1421

15

5. Level instrument with foot screws until the air bubble of the water balance is in

the prescribed circle.


Check levelling regularly.

5. Tablet

Remove the tablet carefully from the packaging, remove plastic cover and install at
intended place of installation, using the table mount.

Charge the rechargeable battery.
Before the first use, the battery should be charged by connecting it to the mains
power supply for at least 8 hours.

6.3 Scope of delivery / serial accessories

Drying unit

Tablet

• Drying unit, see chap. 2
• 10 sample dishes
• Power cable
• Power pack drying unit
• Connecting cable

“balance heating module“

• Operating manual

• Tablet see chap. 2
• Table mount
• Mains adapter
• Micro-USB cable
• RS 232 Bluetooth Adapter

Advertising