Notice – Proheat M125 User Manual

Page 45

Advertising
background image

Re-clamp the Fuel Nozzle stem lightly but firmly in a vise using soft

jaws, take care not to cause damage. Reinstall the distributor and

Fuel Nozzle head. Ensure that the distributor is seated correctly.

The Fuel Nozzle assembly is self-aligning.

f)

Inspect the Fuel Nozzle cavity and clean as necessary using electrical

contact cleaner or warm soapy water.

g)

Reinstall the Fuel Nozzle using diesel fuel to lubricate O-ring.

h)

Reinstall the burner head by mounting it against the heat exchanger face,

turning clockwise to engage the mounting ears on the bolts.

i)

Tighten mounting bolts. See Section 1.3 for torque.

j)

Reconnect the electrical harnesses and fuel supply line.

k)

Switch the PROHEAT on and operate for at least one complete cycle.

Observe the operation.

If a Start diagnostic code is indicated, proceed to Step 4.

Figure 4-7: Fuel Nozzle Assembly.

FUEL NOZZLE ORIFICE

AIR PASSAGES

AIR PASSAGES

FUEL AND AIR OUTLET ORIFICE

HEAD

DISTRIBUTOR

STEM

O-RING

NOZZLE NUMBER
M80 NOZZLE SHOWN

TORQUE = SEE
SECTION 1.3

LUBRICATE
O-RING WITH
DIESEL FUEL

HOLD UPRIGHT
TO ASSEMBLE

ARROWS

SHOW HOW TO

LOOSEN THE

NOZZLE

NOTICE

All plugs/harnesses must be rein-

stalled into the G-II Proheat Control

Module (G-II PCM) before heater

goes back into service.

4-8

PROHEAT M-SERIES G-II PCM SERVICE MANUAL

Advertising
This manual is related to the following products: