PROHEAT M-SERIES G-II PCM SERVICE MANUAL

Fuel Supply Pump cleaning:

a)

Disconnect all harnesses at the G-II PCM.

b)

Disconnect the fuel supply line.

c)

Loosen and back out the burner head mounting (2) bolts five to six turns

allowing enough room to rotate the burner head 15° counter-clockwise

and remove.

d)

Locate the pressure relief valve cap and remove with a slot screwdriver.

Careful not to lose any of the internal components that may fall out.

e)

Remove the spring from the cavity.

f)

Remove the ball bearing from the cavity.

g)

Inspect and clean all components.

h)

Inspect and clean the cavity. Pay close attention to the center hole in the

cavity for any debris or a damaged edge. The edge of the hole should be

smooth with no nicks, do not use any tool that may damage this edge as

this will cause loss of fuel pressure.

i)

Place ball bearing back in cavity on the center hole.

j)

Place spring back in hole with brass ball guide on top of ball bearing.

k)

Install pressure relief valve cap.

l)

Re-test the Fuel Supply Pump. Start from item 'e' in Test procedure –

Fuel Supply Pump pressure, page 4-17.

If the Fuel Supply Pump pressure tests OK, go to item 'm'.

If the Fuel Supply Pump pressure is still incorrect, go to Fuel Supply

Pump replacement

m) Reassemble the burner head.

n)

Reinstall electrical harnesses and fuel supply line.

o)

Switch the PROHEAT on and operate for at least one complete cycle.

Observe the operation.

Fuel Supply Pump Gear Check/Replacement:

a)

Disconnect all harnesses at the G-II PCM.

b)

Disconnect the fuel supply line.

c)

Loosen and back out the Burner Head mounting (2) bolts five to six turns

allowing enough room to rotate the Burner Head 15° counter-clockwise

and remove.

d)

Remove the Ignition Electrode then the Flame Shield.

e)

Disconnect the Fuel Solenoid Valve from the PCM.

r)

To prevent contamination, clean area around the base of the Fuel

Delivery Block prior to disassembly.

g)

Remove the Fuel Delivery Block by removing the three M6 screws and

three Lock Washers. Be careful not to lose the gears or Idler Shaft.

h)

Inspect the gears, gear seats and shafts for damage. Replace as necessary.

Inspect fuel delivery bock screen for contamination.

i)

re-install the two Gears and Idler Shaft into the Compressor Flange

ensuring the area is clean and free of debris Lubricate both Gears with

diesel fuel prior to installation. Note idler shaft orientation.

j)

Install new Fuel Delivery Block large and small O-rings, Inlet Screen and

Inlet Screen O-ring onto the Fuel Delivery Unit as shown. Ensure to

lubricate all O-rings with diesel fuel prior to installation.

Figure 4-20: Pressure Relief Valve Cap.

PRESSURE RELIEF VALVE CAP
TORQUE = 22 in-lbs ±2 in-lbs
(2.5 Nm ±0.2 Nm)

SPRING

BALL BEARING

BALL GUIDE

NOTICE

All plugs/harnesses must be rein-

stalled into the G-II Proheat Control

Module (G-II PCM) before heater

goes back into service.