Test Procedure – Air Compressor pressure (Rotary Vane Compressor models):

Ensure fuel nozzle is clean (see page 4-7)and the air compressor filter is

clean (see page 4-9) before proceeding with air compressor pressure check.

h)

Thread in Pressure Gauge Adapter hand tight as shown in Figure 4-10.

i)

Install pressure Relief Valve & Pressure Gauge on to Pressure Gauge Adapter.

j)

Orient Burner Head similar to assembled on heater.

k)

Connect Power Harness and Remote Switch to the G-II PCM.

l)

Switch the PROHEAT on and observe the air pressure:

o)

Connect the Power, Dual Mode Temperature Sensor and Coolant Pump

electrical connections to the heater Burner Had and reconnect the fuel line.

p)

Activate the heater with the remote switch and observe operation. The

heater should run smoothly with no smoke although there may be some

hesitation initially due to air in the fuel line.

q)

Remove the remote switch and re-connect the control connection.

If a Start diagnostic code is indicated, proceed to Step 5.

MODEL

AIR PRESSURE (ROTARY VANE COMPRESSOR)

M50

6.2 ± 0.1 PSI (42.7 ± 0.7 kPa)

M80

3.2 ± 0.1 PSI (22.1 ± 0.7 kPa)

M105

3.8 ± 0.1 PSI (26.2 ± 0.7 kPa)

NOTICE

Ensure to orient burner head as shown

in Figure 4-10 or an incorrect pressure

measurement may be made.

NOTICE

All plugs/harnesses must be rein-

stalled into the G-II Proheat Control

Module (G-II PCM) before heater

goes back into service.

WARNING

Connect power and switch only. DO

NOT connect the temperature sensor.

PRESSURE
GAUGE
ADAPTER

ROTARY VANE
COMPRESSOR

PRESSURE

RELIEF VALVE

FLAME

SHIELD

IGNITION

ELECTRODE

ASSEMBLY

Figure 4-10: Air Pressure Test. Rotary Vane Compressor Model.

DIGITAL
MANOMETER
(P/N PK0036)