Proheat M125 User Manual

Page 74

Advertising
background image

4-37

PROHEAT M-SERIES G-II PCM SERVICE MANUAL

MOUNTING BOLTS (2) TORQUE = SEE SECTION 1.3

COOLANT PUMP

SWITCH INPUT

DUAL MODE TEMP
SENSOR

POWER

FUEL INLET

Figure 4-39: Burner Head Removal and Motor Mechanical Check.

FUSE COVER AND FUSE

Procedure – G-II PCM fuse replacement:

a)

Disconnect all harnesses at the G-II PCM.

b)

Disconnect the fuel supply line.

ci)

G-II PCM—Locate and measure across pins C and E in the G-II PCM Data

Link connection. Perform this with the PROHEAT off and then switched on.

If the voltage is within the operating range and a Voltage diagnostic code is

indicated, the G-II PCM is faulty. Go to G-II PCM replacement, page 4-38

If the voltage falls below the required voltage when the Motor starts,

check the wiring from the supply source to the PROHEAT G-II PCM.

Figure 4-38: G-II PCM Datalink Connection.

G-II PCM DATALINK
CONNECTION

G

E

F

B

C

RED (+)

BLACK (-)

Advertising
This manual is related to the following products: