Notice – Proheat M125 User Manual

Page 53

Advertising
background image

NOTICE

All plugs/harnesses must be rein-

stalled into the G-II Proheat Control

Module (G-II PCM) before heater

goes back into service.

m) Using new O-rings install Fuel Delivery Block large and small O-rings, Inlet

Screen and Inlet Screen O-ring onto the rear of the Fuel Delivery Unit.

Ensure to lubricate all O-rings with diesel fuel prior to installation.

n)

Re-install the Fuel Delivery Block using the three original Screws and 3 x

Lock Washers. Torque to 75 ±7 in-lbs.

o)

Re-install the Flame Shield, Ignition Electrodes and the Fuel Solenoid

Valve Connector.

p)

Reinstall the burner head by mounting it against the heat exchanger face,

turning clockwise to engage the mounting ears on the bolts.

q)

Reconnect the electrical harnesses and fuel supply line.

r)

Switch the PROHEAT on and operate for at least one complete cycle.

Observe the operation.

If a Start diagnostic code is indicated, proceed to Step 7.

NOTE: LUBRICATE

O-RINGS WITH DIESEL

FUEL PRIOR TO

INSTALLATION

NOTE: INLET SCREEN

AND O-RING

ASSEMBLY ORDER

BLOWER HOUSING

COMPRESSOR
FLANGE

FLAME
SHIELD

IGNITION
ELECTRODE

GEARS

O-RING

O-RING

O-RING

O-RING

O-RING

O-RINGS

SCREEN
PLATE

UNDERSIDE OF
SCREEN PLATE

SCREEN

SCREEN

FUEL REGULATOR

O-RING

3 x M6 SCREWS
TORQUE
75±7 IN-LBS

2 x M6 SCREWS & LOCK WASHERS
TORQUE 75±7 IN-LBS

LOCK

WASHERS

FUEL

DELIVERY

BLOCK

IDLER SHAFT
INSERT WITH THREADED
HOLE OUTWARDS

FUEL SOLENOID

VALVE CONNECTOR

Figure 4-17: Fuel Regulator Removal and Reinstallation.

4-16

PROHEAT M-SERIES G-II PCM SERVICE MANUAL

Advertising
This manual is related to the following products: