Programmable devices, Hardware installation, Front blade – ADLINK aTCA-N700 User Manual

Page 21: Table 4-6 programmable devices

Advertising
background image

aTCA-N700 HW Users Guide

21

4.1.3. Programmable Devices


There are programmable devices with their own images on the board. The board is
provided with default images programmed for all the mandatory devices, and most of
them are upgradable as described in

Table 4-6

.

Table 4-6 Programmable devices

Component

Part Number

Content

Remarks

NAND flash memory

MT29F16G08AB
ABA

Linux and user
application

SPI flash memory

SST25VF080B

Uboot image

IPMC

A2F500M3G-
FGG484I

IPMC image

EEPROM

M24256 (256Kb)

IPMI variables

NOR flash memory

JS48F4400P0TB
00A

Linux and user
application

Optional to
replace NAND
flash

Micro-SD card

4GB

Linux and user
application

CPLD

LCMX0640C-

3FTN256C

CPLD Image


4.2. Hardware Installation

The steps required to install the ATCA-N700 are the following: Front Blade installation,
RTM installation, Monitoring Station connection, and Traffic Port connection.

4.2.1. Front Blade


The board should be plugged in as per the following procedures:

Step 1: The injector handles (top and bottom) shown in Figure 4-6 should be
opened to plug the board into a chassis slot.
Step 2: The board should be aligned on to the rail (marked as (A)) in the reserved
slot for the board
Step 3: Slide the board into the chassis until the guide of the faceplate and the
hole of the chassis meet as in (B)
Step 4: Once the guide of the faceplate slides into the hole, close the upper
injector handle so that the handle wedge goes into the handle hole and makes a
click sound.





Advertising