Figure 4-6 in/ejector handle (bottom side), Figure 4-7 plugging the board – ADLINK aTCA-N700 User Manual

Page 22

Advertising
background image

aTCA-N700 HW Users Guide

22

Step 5: When the chassis is powered up and in operation, during plugging-in the
board (Hot Swap situation), the board starts booting up as soon as the handles
are fully closed in Step 4.

Figure 4-6 In/Ejector handle (bottom side)

Figure 4-7 Plugging the Board

Note*: After plugging in the board, make sure that the injector handle is locked into the
hole on the faceplate. This will trigger the hot swap switch activated and booting will
start.


To pull out the main board, follow the steps described in the following:

Step 1: The bottom side injector handle should be slightly pulled out to the front
from the hole without pulling out the board.
Step 2: Once the injector handle is out from the hole, the Hot Swap switch
becomes OPEN
Step 3: The Hot Swap LED (or Blue LED) should then start blinking and it will
stay ON after several seconds, which indicates the READY status.
Step 4: At the READY status, completely open the top and the bottom handles
and pull out the board from the chassis.

4.2.2. RTM

The optional RTM1 that provides rear side loading of SFP+ ports can be installed to
interwork with the front blade with the very similar procedures described in the front
blade case. The front blade should be plugged in first. Refer to the RTM Users Guide
for the details

Advertising