Heath Consultants GT Series User Manual

Page 38

Advertising
background image

3-16

USER HANDBOOK

The screen, shown in Fig. 3.24, is displayed when

the Service date has expired. i.e. overdue.

Fig. 3.24 Switch OFF

To proceed with the switch-off sequence:

•

Press and hold both the LH button

and the RH

button

simultaneously.

Warm-up Complete
The instrument will now automatically select the Leak

Test Mode, as default.

The following configurable options are available:

a) To start up in specific operational mode.
b ) To start up in the mode last used.

Advertising