Martin Christ RVC 2-33 CDplus User Manual

Page 37

Advertising
background image

RVC 2-33 CD

&

Using the RVC

Version 01/2009, Rev. 1.21 of 25/11/2013 - sb

37

Translation of the original operating manual

6.3.4.2 Warm-Up

Before starting an evaporation process, the vacuum pump and the
cooling trap should warm up until they reach their respective
operating temperatures.
For this purpose, the warm-up phase can be started. The rotor can
optionally be installed. The warm-up time and the set value for
heating can be selected (see 6.3.5.5 "Options").
To start the warm-up:

Press the left-hand function key "mode"
Select "Warm-Up" with the up and down keys
Press the right-hand function key "enter" to confirm


During the warm up:

The rotor chamber is preheated - with or without rotor - when the
lid is closed.

The vacuum pump is switched on.

The cooling trap is switched on if it is connected via the control
system with the rotational vacuum concentrator (see 5.4.3
"Connection of Vacuum Pump and/or Cooling Trap").If there is no
connection, the cooling trap must be switched on separately.


When the preset warm-up time is over, the control unit displays the
following message:

Fig. 6.9: Message after the warm-up

Now the lid can be opened in order to load the rotor with the
product or to install the loaded rotor.

Close the lid. A menu appears "Continue with phase..."

Fig. 6.10: Continuing the evaporation

Continue the process by selecting "Evaporation manual" or

"Evaporation program".

Advertising