Control setup – Pinnacle Systems STTS User Manual

Page 11

Advertising
background image

5

CONTROL SETUP

Choose number of mat(s) per zone (metal box

controller only):

Zone 1 mats must start at Mat input #1 and work up.

Zone 2 mats must start at the next available mat input,

and so on. The S5 jumper block is used to program

the number of mats per zone (see "User Configuration

Jumpers").
NOTE: The total number of zones your STTS

controller has was determined at the time of order

placement and is from 1 to 3. If you need to increase

the number of zones at a later date, the unit will need

to be shipped back to the place of purchase for an

upgrade.

Choose your options:

You may select manual or automatic zone resetting (see "User Configuration Jumpers").

MANUAL: If you select manual, you will have to go to the control box and press the zone reset button

each and every time you step on any mat(s) Metal box: Place jumper across JP6 MAN on the top board.

Din-Rail: Place jumper across JP3 MANUAL

AUTOMATIC: If you select automatic, the zone will clear itself when you have stepped off the mat(s).
Metal Box:

Remove jumper across JP6 MAN on the top board.

Din-Rail:

Remove jumper across JP3 MANUAL.

NOTE: This setting changes all mats, you cannot change some mats to manual and some to

automatic.

EXTERNAL RELAY CHECKING: External relay checking option is selected when you have to switch a

large load. This feature allows the STTS to monitor your external relays. This system requires that you

use two force-guided relays for the external switching and that the secondary pole of each relay (N.C.) be

tied in series back to the STTS control external relay input terminals for each particular zone
Metal Box:

Place jumper across JP6 EXT on the top board to activate this feature.

Din-Rail:

Place jumper across JP4 EXT to activate this feature.

Metal box mounting location:

After choosing an appropriate location you will need to remove the computer board and the power supply

board from the box in order to punch two holes—one for the power lines and the other for mat wiring.

See "Wiring Diagram for Mats" and "Wiring Diagram for Zones” for wiring hookups.

HOOKUP POWER AND ZONE STOP CIRCUITS TO POWER SUPPLY BOARD:

1) Attach power lines to J3 PLUG (LINE, NEUTRAL, GROUND). Line and Neutral are un-polarized

for DC use.

2) Attach stop circuit to terminals 1 & 4 of J5 for Zone 1, terminals 10 & 13 for Zone 2, terminals 19

& 22 for Zone 3.

3) Attach auxiliary circuit to terminals 5,6,7 for Zone 1, terminals 14,15,16 for Zone 2, terminals

23,24,25 for Zone 3.

4) Attach External Relay Checking input wires to terminals 8,9 for Zone 1, terminals 17, 18 for Zone

2, terminals 26,27 for Zone 3.

Din-Rail controller:

The controller must be mounted inside an enclosure since all the wiring terminates on the outside of the

controller box.

1) Attach 24vdc power, and stop circuit(s) to the POWER/OUTPUT plug

2) Hook up mats to the mat # plugs.

3) Hook up options to the INPUT/OUTPUT plug

P.O. Box 100088

Pittsburgh, PA 15233

800-569-7697 FAX: 412-262-4055

www.pinnaclesystems.com

Advertising
This manual is related to the following products: