Sam ple proj e c t – Argox Architect 1.11 User Manual

Page 49

Advertising
background image

45

A

RCHITECT

®

U

SER

S

M

ANUAL

4

Sam

ple

Proj

e

c

t

• Select Logistics > Operator

= * (multiplication); With

Node = Amount.


• On the Compare page,

configure: Condition = <;
With Constant =

500”.

8. Create a display node.

• Name it “ADDCharge”.
• Create the display text and set the time.

9. Create link nodes.

• Link Item_ID to Quantity.
• Link Quantity to Amount.
• Link Amount to Total.
• Link Total to ADDCharge.
• Link Total to Item_ID.

• Double-click Item_ID and go to the Link page.
• Select Link Out > Quantity > Condition = Verify Node;

Node Status = Succeed.

• Double-click Total and go to the Link page.
• Select Link Out > ADDCharge > Condition = Verify Node;

Node Status = Succeed.

10. Save the project.

11. Compile and simulate.

12. Download the application to the Terminal.

Advertising