Installation, Top view 1/2” drywall 5/8” drywall, Top view – Avalon Firestyles 564 SS Gas Installation User Manual

Page 15

Advertising
background image

Installation

(for qualified installers only)

1 5

© Travis Industries

4 0 7 0 6 2 0

100-01188_000

Nailing Brackets

NOTE: Additional nailing

brackets are provided along

the base of the fireplace.

Use these brackets if not

using the front brackets.

For installations using

5/8” drywall fold the

shorter tab out 90° (use

a screwdriver if

necessary).

For installations using

1/2” facing fold the larger

tab out 90° (use a

screwdriver if necessary).

Fireplace

Drywall

Framing

Nailing Bracket

TOP VIEW

1/2” Drywall

5/8” Drywall

There are four nailing brackets

on the front of the fireplace.

Follow the directions below to

prepare the nailing brackets.

Once in place, nail or screw the

nailing brackets to the framing.

Fireplace

Drywall

Framing

Nailing Bracket

TOP VIEW

WARNING:

Make sure the fireplace is

square and plumb when

placed in the framing.

Measured corner-to-

corner, the fireplace

should be square (approx.

47-1/8” for each

dimension). Use shims to

insure the fireplace is

square.

Advertising
This manual is related to the following products: