5 6 finalizing the installation – Avalon Firestyles 564 SS Gas Installation User Manual

Page 56

Advertising
background image

5 6

Finalizing the Installation

(for qualified installers only)

Travis Industries

4 0 7 0 6 2 0

100-01188_000

3

Follow the directions below to replace the orifice.

1/2" Wrench

Use a 1/2” open end wrench

to unscrew the two orifices.

Screw each LP orifice in so the

orifice protrudes 15/16”

(indicating full insertion).

d

Look here for the orifice identification

Apply thread sealant to the LP

orifices prior to installation. Use

the chart below to identify the

correct orifices.

Front

Rear

NG

#56

#50

LP

#67

1.1

c

b

Front Burner

Orifice

a

Slide the air shutters all

the way to the right.

Rear

Burner

Orifice

15/16”

Remove and discard the front burner

gasket (used only for NG installations)

e

Advertising
This manual is related to the following products: