3installation, 1 work rules, 2 tools and equipment needed – AEC VacTrac Series Conveying Systems User Manual

Page 39: 3 mechanical installation

Advertising
background image

VacTrac™ Series Conveying Systems

Page 39

Mechanical Components

WH2-605A.4

3

Installation

3-1 Work Rules

Install, operate, and maintain this equipment according to appli-
cable work and safety codes for your location. This includes
OSHA, NEC, CSA, SPI, and any other local, national, and interna-
tional regulations. Obey these specific work rules:

;

Read and follow the instructions in this manual before

installing, operating, or maintaining a VacTrac system.
Additional copies are available from AEC, Inc.

;

Only qualified persons should work on or with this equipment.

;

Work only with approved tools and devices.

;

Disconnect and lock out power while working on this

equipment.

3-2 Tools and Equipment Needed

You’ll need the following:

• Hand tools.
• Fork lift or overhead lift.
• Wire, conduit, and fittings for wiring runs.
• Anchor bolts with nuts and washers or red head-type anchors.
• Compressed air pipe and fittings.

3-3 Mechanical Installation

Conveying system installations vary depending on the application:
in-plant distribution or rail car unloading, single or multiple
material line systems, pellets, or powders. The sections on the
following pages are general installation rules.