2 making process connections – AEC FSS Series 1.5- 10 HP Fountain Solution Systems User Manual

Page 23

Advertising
background image

Page 22

FSS Series Fountain Solution Systems

IAE-600

3-2 Making Process Connections

All Models

All FSS Series circulators have a bulkhead plate with the following
connections in the back:

• The system overflow connection, labeled Overflow, is the 1”

outlet for the system reservoir overflow. This should be
connected per local codes for a chemical drain and not to a
city drain.

• The city water “in” connection, labeled Water In, is the 1”

inlet leading from the customers city water make-up.

• The press process supply connection, labeled To Process, is

the 1” (1.5”) outlet for the supply solution to the press.

• The press process return connection, labeled From Process,

is the 1” (1.5”) inlet from the return pump/return tank.

• The condenser water “in” connection, labeled CHW In, is

the 1” connection from customers central chilling system
supply or from customer city water supply.

• The condenser water “out” connections, labeled CHW Out,

is the 1” connection to the customers central chilling water
return or to the customers city water return.

• The air supply connection for the systems return pump

controls, labeled Air In, is the ½” polytube connection from
the customers central air supply.

• The air supply connection for the return pump, labeled Air

Out, is the ½” polytube connection to the systems return
pump air inlet.

• The Etch Chemical connection, labeled “ETCH”, is the 3/8”

polytube connection from the chemical wand located in the
customers drum or tote.

• The Additive Chemical connection, labeled “ADDITIVE”,

is the 3/8” polytube connection from the chemcial wand
located in the customers drum or tote.

Advertising