Startup Checklists

6-1 Introduction

Follow the check lists below for the start-up of your new
circulator. These lists assume the installation information
elsewhere in this manual has been read and followed. New
circulators should be started up and checked by a qualified
refrigeration service technician.

6-2 FSS Series Chiller Startup Checklist

;

Check the shipping papers against the serial tag to be sure

chiller size, type and voltage is correct for the process that will
be controlled. FSS circulators are built with a voltage specific
compressor and cannot be re-wired for an alternate voltage.

;

Check the transformer primary voltage connections to be sure

they are configured for the electrical power you are using. The
voltage at the main power connection must read within plus or
minus ten percent (±10%) of the voltage listed on the serial tag.
Electrical connections must conform to all applicable codes.

;

Complete chilled water To Process and From Process

connections.

;

The chilled water To and From process valves on the

circulator must be open.

Important!

Do not run the system dry, doing so will result in pump seal damage.

;

The air-cooled condenser should have an adequate supply of

60º to 95ºF (16º to 35ºC) air for proper operation.

;

The city water condenser cooling in and out connections

should be completed and an adequate supply of 85ºF (30ºC)
tower or 70ºF (21ºC) city water, at 25 psi pressure, for proper
operation.

;

Connect the main 3 phase incoming power to the unit making

certain that line one (1) L1 is connected to the A phase, line
two (2) L2 is connected to the B phase, and line three (3) L3 is
connected to the C phase. Check for proper rotation direction
of fan(s) and pump(s).