10 introduction, 11 setup, 1 tests and checks before programming – ARAG GCS 3200 User Manual

Page 14: 2 command location

Advertising
background image

14

10

introduction

The images and the relevant description texts of this manual are indicative and they may vary according to the Virtual Terminal

being used. In case of mismatch between the description herein and the information displayed on your Virtual Terminal, refer to
the manual supplied with it.

11

setup

11.1

Tests and checks before programming

Before computer programming, ensure:
• that all components are correctly installed (control unit and sensors);
• the connection to the power source;
• the component connection (main control unit and sensors).
Failure to correctly connect system components or to use specified components might damage the device or its components.

11.2

Command location

Menu

Fig. 18

Press

F (Fig. 18) to display the next page of the menu (Fig. 19).

Fig. 19

Press

E (Fig. 19) to display the previous page of the menu (Fig. 18).

Advertising