6 position on farming machine, 1 system recommended composition, 2 gcs3200 positioning – ARAG GCS 3200 User Manual

Page 7: System recommended composition, Gcs3200 positioning, Installation

Advertising
background image

7

6

position on farMing Machine

6.1

System recommended composition

asseMbly diagraM for crop sprayer

Fig. 3

Legend:

a

Standard ISOBUS connector

b

Auxiliary input

d

Filling pump

e

Hydraulic unit

f Flowmeter
g

Main valve

M

Pressure sensor

p

Control valve

r

Foam marker

s

Speed sensor

t

Filling flowmeter or

Pump Protector

u

Job computer

X

RPM sensor or Pump Protector

1÷7 Section valves
1÷13 Section valves

(sequential version)

6.2

GCS3200 positioning

Observe the following precautions:

- Do NOT install the devices in areas where it would be subjected to excessive vibrations or shocks, to prevent any damage or
accidental use;
- Install the devices in a visible position within easy reach by hand; bear in mind that they should not obstruct the operator’s
freedom of movement or block his view.
Consider all necessary connections of the devices (Fig. 4
and Fig. 5), the cable length, and make sure there is enough space for
connectors and cables.
An identification symbol is located next to each connector to indicate its function. For any reference to the system configuration
read Par. 6.1 System recommended composition.

Fig. 4

item

Monitor connection points

Job coMputer

1

Standard ISOBUS connector

2

Sensors

3

Control unit

4

Hydraulic unit

Tab. 1

Fig. 5

item

Monitor connection points

auXiliary input

5

In-cab connector

6

Serial connector

Tab. 2

INSTALLATION

Advertising