Verification after power-on – H3C Technologies H3C S9500E Series Switches User Manual

Page 59

Advertising
background image

49

Starting application at 0x00100000 ...

TLB init OK.

LBC init OK.

LAW init OK.

Bsp init start...

MMU init OK.

CRC init OK.

Frame data init OK.

Connect IRQ 0 OK.

Enable IRQ 0 OK.

Connect IRQ 1 OK.

Enable IRQ 1 OK.

Connect IRQ 2 OK.

Enable IRQ 2 OK.

Connect IRQ 4 OK.

Enable IRQ 4 OK.

Connect IRQ 5 OK.

Enable IRQ 5 OK.

Connect IRQ 6 OK.

After the switch completes booting the applications, the following information appears on the terminal

screen:

Press ENTER to get started.

Press Enter to begin configuring the switch at the prompt:

<H3C>

NOTE:

The S9500E switches provide a command line interface (CLI). For more information about the CLI, see

H3C S9500E Switch Series Fundamentals Configuration Guide.

The output depends on your switch model.

Verification after power-on

H3C recommends that you check the following conditions after the switch is powered on:

The cooling system is working. You should be able to hear fan rotation noise and feel air being
blown out.

All the LEDs are functioning properly.

Table 14 LED status when the switch operates properly

Part LED Name/Color

Status

MPU

MPU status LED

SFC (green)

Steady on

ACT (green)

Active MPU—Steady on

Standby MPU—Off

RUN (green)

Flashing

LPU status LED

RUN (green)

Flashing

Advertising