6 Commissioning

6.1 Commissioning the Inverter

1. Check the following requirements before commissioning:

– The inverter is correctly mounted and connected.
– The miniature circuit-breaker is correctly dimensioned.
– The small wind turbine system is correctly grounded in accordance with the instructions of

the manufacturer.

– The rectifier and overvoltage protection (e.g. Windy Boy Protection Box) are installed

between the small wind turbine system and the inverter

– Unused DC inputs are closed using the corresponding DC connectors and sealing plugs.

2. Switch on the miniature circuit-breaker.
3. Commission the small wind turbine system in accordance with the instructions of the

manufacturer.
☑ All 3 LEDs lit or flashing: the startup phase commences.
☑ Green LED lit: commissioning was successful.
or
☑ Green LED flashing: grid connection conditions have not yet been reached.
or
☑ Red LED lit or flashing: a disturbance has occurred. Proceed to step 4.

4. Read Section 9 "Troubleshooting" (page 65) and if necessary, eliminate the error or fault.

Object

Description

A

Green LED: operation

B

Red LED: ground fault or varistor
defective

C

Yellow LED: disturbance

Self-test in accordance with DK 5940, Ed. 2.2 for initial commissioning
(applies to Italy only)
The Italian standard DK 5940 requires that an inverter may only be operated on the power
distribution grid if the disconnection times for overvoltage, undervoltage, minimum
frequency and maximum frequency have been tested.
Start the self-test as described in Section 6.3 "Self-test in Accordance with DK 5940, Ed.
2.2 (Applies to Italy Only)" (page 50). The test
takes approx. 8 minutes.