MCZ Boxsystem 75 FR User Manual

Page 6

Advertising
background image

Chapter 2

INSTALLATION AND USE MANUAL

page

6

Theoretical concepts for installation

Technical service - MCZ S.p.A. all rights reserved - Reproduction prohibited

2. INSTALLATION CONCEPTS ACCORDING TO UNI 10683

2.1. OPERATING AREA

For good operation and good heat distribution, the appliance should be

positioned in a place where the air required for combustion can flow (at

least 60 m

3

/h must be available) according to installation standards and

current regulations in the country of installation.

The room volume must not be less than 60 m

3

.


Air must enter through permanent openings on the walls (near the

product) that open outdoors with a minimum section of 150 cm

2

.

These openings (air vents) must be made so as not to be obstructed in

any way.
Air can also be taken from adjacent rooms as long as these are

equipped with outdoor air vents and are not bedrooms or bathrooms or

rooms where fire hazards exist such as garages, wood sheds or

flammable material warehouses, strictly observing that stated in current

regulations.

The product may not be installed in bedrooms,

bathrooms and where another heating appliance

is installed without autonomous air flow

(chimney, stove, etc.).

Placing the appliance in explosive environments

is prohibited.

The floor of the room where the product is to be

installed must be strong enough to support its

weight.

In the event of wood floors, install a protective

covering in accordance with current regulations

in the country of installation.

If walls are not flammable, install the product at

least 5 cm. from the walls.

2.2. PRECAUTIONS

The product must be installed in a suitable location that permits routine

opening and maintenance operations.
The room must be:

set for room operating conditions

equipped with an adequate smoke exhaust system

equipped with outdoor ventilation

Advertising