FUJITSU ServerView Resource Orchestrator Cloud Edition J2X1-7611-03ENZ0 User Manual

Page 71

Advertising
background image

3.

Reconfigure Hardware Properties after Replacement

After replacing the server, reconfigure Resource Orchestrator with the latest hardware properties.
For details on how to reconfigure hardware properties, refer to "

9.3.1 Reconfiguration of Hardware Properties

".

When using VIOM, refer to the manual of ServerView Virtual-IO Manager and perform inventory boot on ServerView Virtual-
IO Manager.

For SPARC Servers/SPARC Enterprise Servers

-

Replacing a Server with Spare Servers Assigned

Use the following procedure to switch applications over to a spare server and replace a server with minimal interruption.

-

When Replacing an HBA

1.

Perform Server Switchover

Switch over the server to replace with its spare server.
For server switchover, refer to "Chapter 4 Server Switchover" in the "Operation Guide VE".
The server to replace is automatically powered off after switchover.

2.

Replace the Server

Replace the HBA of the server.
Change the OBP settings of the replacement server to match the operating environment.
For details on OBP settings, refer to "8.2 Configuring the Server Environment" in the "Design Guide CE".
Shut down the server after completing OBP settings.
Configure the remote management controller of the replacement server with the same IP address, user name, password, and
SNMP trap destination as those set on the original server.

3.

Change the WWN Information Settings

Change the WWN information settings for after server replacement to the WWN value of the HBA after server replacement.
Leave the value of the target CA as the one before changes were made.

4.

Perform Post-server Switchover Operations

For details on the operations that must be performed after server switchover, refer to "4.3 Post-Switchover Operations" in
the "Operation Guide VE".

Note

If takeover was performed before replacement of the HBA, release the spare server settings. Change the WWN information
settings following the procedure in "Replacing a server with no spare server assigned".

-

When not Replacing an HBA

1.

Perform Server Switchover

Switch over the server to replace with its spare server.
For server switchover, refer to "Chapter 4 Server Switchover" in the "Operation Guide VE".
The server to replace is automatically powered off after switchover.

2.

Replace the Server

Replace components (other than the HBA) of the server.
Change the OBP settings of the replacement server to match the operating environment.
For details on OBP settings, refer to "8.2 Configuring the Server Environment" in the "Design Guide CE".
Shut down the server after completing OBP settings.
Configure the remote management controller of the replacement server with the same IP address, user name, password, and
SNMP trap destination as those set on the original server.

- 57 -

Advertising