VEntInG InStaLLatIOn

Continued

Pitch

Slope Opening

"A" Max.

Used Flashing

Model No.

Flat

15"

V6F-8DM

0-6/12

26.6°

16

1

/

8

"

V6F-8DM

6/12- 12/12 45.0°

20

3

/

8

"

V12F-8DM

FLASHING INSTALLATION (V6F-8DM

OR V12F-8DM)

Determine flashing to be used with roof open-

ing chart. Slide flashing over pipe until base is

flat against roof. Replace as many shingles as

needed to cover exposed area and flashing

base. Secure in position by nailing through

shingles (see Figure 17). DO NOT NAIL

THROUGH FLASHING CONE.

Figure 16 - Roof Opening Measurements

PENETRATING ROOF

To maintain a 1" clearance to pipe on a roof

with a pitch, a rectangular opening must

be cut.
1. Determine center point where pipe will

penetrate roof.

2. Determine center point of roof. Pitch is

the distance the roof drops over a given

span, usually 12". A 6/12 pitch means that

the roof drops 6" for each 12" measure

horizontally down from roof rafters.

3. Use roof opening chart (Figure 16) to

determine correct opening length and

flashing required.

4. Remove shingles around opening mea-

sured. Cut out this section.

14

3

/

8

"

(36.5 cm)

30"

(76.2 cm)

1"

(2.5

cm)

1"

(2.5

cm)

Minimum Measurements

1"

(2.5 cm)

Opening "A"

Nail Only

Outer

Perimeter

of Flashing

Storm Collar

Flashing

Cone

Underlap Shingles

at Bottom

Overlap

Shingles Top

and Sides Only

Figure 17 - Flashing Installation

Installing Flashing on a Metal Roof

When installing flashing on a metal roof, it

is required that putty tape be used between

flashing and roof. Flashing must be secured

to roof using #8 x 3/4" screws and then sealed

with roof coating to prevent leakage through

screw holes. A roof coating must also be ap-

plied around perimeter of flashing to provide

a proper seal.
Storm Collar Installation (SC1 or SC2)

Place storm collar over pipe and slide down

until it is snug against open edge of flashing

(see Figure 18). Use SC1 for all round ter-

minations and SC2 for all terminations with

slip sections. Apply waterproof caulk around

perimeter of collar to provide a proper seal.

Figure 18 - Storm Collar